Our process

How we build, from first call to move-in day

The same team, the same point of contact, from your first enquiry through to the last coat of finish, and beyond.

Five stages

What happens, and when

Jakub is your point of contact at every stage, so nothing gets lost between a sales team, a designer and a build crew.

01 Day 1

Initial conversation

A call or a visit to your garden to talk through what you need, your budget, and how the room will be used. No pressure, and no cost to you.

A long London garden with a cedar garden room at the far end.
02 Weeks 1–2

Design & 3D visualisation

We draw your room around your garden's actual shape, slope and access, and share a 3D visualisation so you know exactly what to expect before anything is agreed.

A 3D design render of a cedar garden room with bi-fold doors, open-sided terrace and BBQ area, with dimensions marked.
03 Weeks 2–3

Quote & planning check

A fully itemised quote, plus a check on whether your project needs planning permission. If it does, we handle the application for you.

Cedar cladding boards on site, specified and priced in the quote.
04 Weeks 4–9

Construction

Foundations, structural build, insulation, electrics and finish, built on-site by our own team, with regular updates as the room takes shape.

A garden office frame under construction in a walled London garden.
05 Week 10 onward

Handover & aftercare

A final walkthrough and snagging check before handover, followed by two years of free aftercare, inspections every six months, included.

A finished cedar garden office with anthracite French doors, ready for handover.
What we need from you

A short list, so the build runs smoothly

A finished black-clad garden studio with a wide sliding door.

Clear access on delivery day

Enough room for materials to reach the build site, we'll agree the route with you in advance, whatever the access is like.

Your finish decisions

Cladding, internal finish and any extras agreed before construction starts, so the build runs without pauses.

Any planning conditions

If your project needs permission, sign-off before construction begins, we'll manage the application, but it needs to be granted first.

Someone reachable during the build

Not necessarily home every day, but reachable if we need a quick decision on-site.

FAQ

Process questions, answered

How long does the whole process take?

From first conversation to handover, most projects take 10-12 weeks in total, including design and any planning check, with construction itself typically running 5-6 weeks.

Do I need to be home during construction?

No, though it helps if you're reachable for quick decisions. Many of our clients are at work during the day while we build.

Can I make changes once building starts?

Small changes are usually possible and we'll always talk through the cost and time impact before agreeing to anything. Larger changes are easier to make at the design stage.

What if I need planning permission?

We'll flag this at the design stage and handle the application on your behalf. It adds time to the process, but most applications for a garden building are relatively straightforward.

Jakub on site, finishing the roofline of a cedar-clad garden office.